Add parallel Print Page Options

Solomon Builds the Temple

It was in midspring, in the month of Ziv,[a] during the fourth year of Solomon’s reign, that he began to construct the Temple of the Lord. This was 480 years after the people of Israel were rescued from their slavery in the land of Egypt.

The Temple that King Solomon built for the Lord was 90 feet long, 30 feet wide, and 45 feet high.[b]

Read full chapter

Footnotes

  1. 6:1 Hebrew It was in the month of Ziv, which is the second month. This month of the ancient Hebrew lunar calendar usually occurs within the months of April and May.
  2. 6:2 Hebrew 60 cubits [27.6 meters] long, 20 cubits [9.2 meters] wide, and 30 cubits [13.8 meters] high.

Bible Gateway Recommends